Monday, 23 January 2012

My Individual Editing of Heartbreak



16th January 2012

Today i spent an hour n half putting my own edit of Heartbreak together i got up to half way with some edits. I cut some shots that i thought didn't fit into the sequence and left some out.
I found final cut quite easy to use as i have had a lot of experience on it before, so this has befitted me in this process. a lot




23rd January 2012

Today i spent around an hour finishing of my editing for Heartbreak. 
I again cut shots and took some out so that it fitted what i wanted it to look like. I also moved some shots around as i had a little difficulty putting the story together to make sense. However when i moved some shots around i felt it worked in the end. 
There is a point in the sequence '1:01 till 1:1 30' i feel the foley will fit in very well. 













After Feedback from sir


After sir watched my editing throw he gave me some advice to change some pits and cut a bit more, so the opening is shorter and doesn't drag along




i really cut up my work so the story is told quicker and its snappy,so that the audience would want to know more and watch the rest of the film.  When i done this and watched it back i felt it was much better faster and more attractive to wanting to watch more.


Final Edit



Saturday, 14 January 2012

The Shot


We had a filming on the 
Thursday 12th January 2012- on this day we had quite a few stuggles as there was not enough people to help us with our equipment and the car driver did not turn up, we got some shots done as the lighting was perfect for us to shot in, however due to that we couldn't film the whole thing.
On the 13th January 2012 we had a group meeting we organised the shot again to make sure everyone would turn up to help us we arranged the a good time for the right lighting as the day before and went through what we are going to do.  Our last day of  filming was on  
14th January 2012, this was a great success we took our time filming and concentrated on getting the right shots ect. we had the proper car driver and people to help with equipment ect, the lighting was perfect and things went very smoothly. I was filming the film throught.